3-DoF State Vector
Time0.00 s
Altitude (z)500.0 m
Downrange (x)0.0 m
Vertical Speed−70.0 m/s
Horizontal Speed0.0 m/s
Pitch Angle90.0°
Pitch Rate0.0 °/s
Propulsion
Active Engines3
Throttle80%
Gimbal (actual)0.0°
TVC Lag0.00°
Prop remaining
25000 kg
Thrust (total)—
TWR—
Aerodynamics & Environment
Dyn. Pressure (q)—
Heat Flux—
Angle of Attack—
Wind Speed—
Discrete GustINACTIVE
Air Density—
Mechazilla Catch Gate
Catch StatusSTANDBY
Lateral Error—
Descent Rate—
Contact Load—
Altitude Profile
Vertical Speed Profile
Nose LOX Header Tank
Pendulum Angle0.0°
Inlet Submergence2.95 m
Gas Ingestion RiskSAFE
Inter-Tank CH₄ Header Tank
Pendulum Angle0.0°
Inlet Submergence2.40 m
Gas Ingestion RiskSAFE
Slosh Dynamics
Net Slosh Torque—
CoM Shift (lat)—
Overall RiskSAFE
BafflesENGAGED
LOX Free-Surface Angle
Orbital Transfer (Artemis III / Mars)
Transfer Target80,000 kg LOX
Flow Rate218.1 kg/s
Duration6.1 min
Bond Number262,559 ✓
Efficiency99.99%
Active Interlock Status
Hold-Down Gate
SAFE
Touchdown Gate
STANDBY
Actuator Alloc
NOMINAL
Engine-Out
NOMINAL
IIP Corridor
CLEAR
AFTS Destruct
NOT ARMED
Hold-Down Clamp Sensor
Vert. Acceleration0.01 m/s²
Vert. Displacement3.0 mm
Clamp Tension5.80 MN
Clamp margin
96%
Multi-Sensor Touchdown Gate
Radar Altimeter—
LiDAR Altimeter—
INS Integrated—
Fused Altitude—
Contact Force—
Plume BackscatterCLEAR
Debris Footprint (IIP)
IIP Downrange0.05 km
3σ Dispersion±1.50 km
Time to Impact—
CorridorSAFE
Incident Reference Library
Tianlong-3 (2024)
Test stand clamp failure → unauthorized liftoff. Mitigated by sub-20ms cutoff gate.
Deep Blue Nebula-1 (2024)
Radar altimeter plume corruption → premature engine cutoff. Mitigated by dual-condition gate.
Hyperbola-1 Y5 (2021)
Grid-fin jam → torque authority lost. Mitigated by pseudo-inverse RCS reallocation.
Zhuque-2 / Engine-Out
Flameout → asymmetric pitch. Mitigated by TVC CoM trim + burn reshaping.
Long March Corridors
Uncontrolled booster impacts on villages. Mitigated by real-time IIP geofencing.
Türksat Fleet Overview
Abort Detector
NOMINAL
Inclined Orbit
DRIFT
EOR Spiral
DAY 30
Wheel Desat
SAFE
XPI Guard
OK
AUPC Boost
+2.9 dB
Upper-Stage Abort — Türksat 1A
Chamber Pressure34.5 / 35.0 bar
Turbopump RPM61,800 / 62,000
LOX Valve99%
GTO Velocity9,800 m/s
Shortfall400 m/s
Abort StatusNOT TRIGGERED
Inclined Orbit — Türksat 1B/1C
Inclination3.08°
N-S Drift Rate0.865°/yr
Pointing Error0.42°
Gain Loss−1.8 dB
Graveyard ΔV7.2 m/s
Disposal SafeYES (15 kg remain)
Electric Orbit Raising — Türksat 5A/5B
Elapsed Days30
Perigee Alt.—
Apogee Alt.—
Solar Array Power11,969 W
Radiation Loss−0.3%
EOR progress
18%
Reaction Wheel Desat — Türksat 6A
SRP Torque3.4 × 10⁻⁵ N·m
Hx momentum
18 N·m·s
Hy momentum
16 N·m·s
Pulse Duration8.3 s
Fuel Consumed0.7 g
Deadband SafeYES ±0.05°
Transponder Guard — Türksat 3A/4A/4B
XPI Isolation33.5 dB > 25 dB ✓
TWTA IBO3.0 dB (linear)
Rain Rate12 mm/hr
Rain Fade2.9 dB
AUPC Command+2.9 dB
IMD3 RiskLOW
Heat Shield Tile Inspection Summary
Total Tiles
600
Intact
569
Missing
10
Cracked
2
Chipped
4
Gap Risk
15
Intact rate
94.8%
Critical replacements0 (NONE this flight)
Hull Thermal Zone Risk Map
Aerothermal Environment
Peak Heat Flux—
Peak Dyn. Pressure—
Stagnation ZoneNose Cap (25m) ×2.5 risk
Highest Risk Zone—
Flap Hinge Acoustic×2.4 vibration factor
Real-Time Heat Flux